Heerema Marine Contractors (HMC) in a consortium with AF Gruppen (AFG) have received notice that Fairfield Betula Limited intends to enter into a contract for the removal and disposal of the Dunlin Alpha topside in the UK continental shelf.
The contract includes Engineering, Preparation, Removal & Disposal (EPRD) of the Dunlin Alpha topside with a total tonnage of approx. 20,000 tonnes. The platform is to be removed and disposed in the period between 2021 – 2024.