  • Fabrication of the NMS Template for IQIP;
  • NMS sections supplied by IQIP;
  • NMS will be used by HMC for installation of 64 monopiles in the EnBW He Dreiht offshore windfarm;
  • He Dreiht offshore windfarm is located in the German sector of the North Sea.

"I feel very proud to be part of the highly professional team at HFG"

Jeroen de Pagter

Project Manager

The Heerema promise

Sustainability
Sustainability

Heerema Fabrication is committed to creating sustainable value on your project.

Team onboard Aegir Greater Changhua project
Safety

We have the highest standards of safety and believe in an incident and injury-free workplace. To achieve this goal we follow our Dare to Care program.

Champion bij Ekofisk 1973
Reliability

With over fifty years of experience you can rely on Heerema to deliver on our promises.

IMG-20240429-WA0000
A001C0036_240424_X389
KUQU3084
VPKA4908
Optional description for this image
IMG-20240429-WA0000 A001C0036_240424_X389 KUQU3084 VPKA4908

Succesful Deployment of the NMS-T-10000

The NMS-T-10000 consist of a double walled center column integrated in a template with six mudmats. By using the NMS-T-10000, underwater noise is blocked as much as possible and in addition the monopile is kept in the correct position during installation.

The center column is made of sections, supplied by our client IQIP in and pre-outfitted as much as possible. The material for the template has been procured by HFG.
End of 2022, HFG received the design drawings. The first materials arrived on site in the beginning of 2023, soon after fabrication started. In March 2024, the NMS-T-10000 was loaded onto HMC’s H-542 barge. Early May 2024, HMC started installing monopiles in the 
EnBW He Dreiht offshore windfarm, using the NMS-T-10000.


Although the Approved for Construction design was significantly more complex and involved a lot more hours than the tender design, HFG managed to complete the project in time. Also, the very challenging dimensional tolerances were achieved.

Key information

Contract type

Fabrication

Location and Milestones

He Dreiht offshore wind farm North Sea 

Structure and Characteristics

Template

Size (LxW): 41.7 x 46.2 meters

Height: 49.0 meters

Weight: approx. 1100t 

Water depth: 37.7 - 40.6 meters

 

 

What’s the destimo ulot volor minus detirati?

In a digital world distance does not exist. But how do you realise enough trust to do business at a distance? Your digital identity and personal data are your most valuable. In a digital world distance does not exist.

Read more

Need a specific answer? Let us help.

Get in touch
Scherm AerolinPhoto-0725

Let’s talk about your challenge.

Want to discuss how our solutions can help your project? Get in touch with one of our experts!